Agency not listed
PREQUALIFICATION POOL OF CONTRACTORS FOR FLOORING MATERIALS, INSTALLATION, SUPP
Due in 234 daysJun 21, 2027, 3:00 PM EDT
- Posted
- Mar 28, 2025
- Set-aside
- None listed
Summary
The summary hasn't been retrieved yet. Read it on the official posting.
Documents
No documents were attached to this posting. Get them from the agency through the official posting.
Similar open bids
No similar bids are open right now.