Camp Pond Dam Reconstruction Project
Due in 5 daysNov 5, 2026
- Solicitation number
- 274-SM 2021-0027
- Posted
- Sep 22, 2026
- Set-aside
- None listed
- Location
- North Carolina
Summary
The Project consists generally of the following major items: • Removing the corrugated metal pipe portion of existing primary spillway, grout and seal off upstream portion of spillway, and demolish and remove existing riser. • Install cured-in-place pipe for reinforced concrete pipe portion of existing primary spillway for stormwater conveyance from existing catch basins on Richland Drive. • Removing the existing auxiliary weir and replacing with a weir with an overall length of 75 feet. • Construct headwall downstream of the cured-in-place pipe. • Place riprap and grouted riprap to tie in downstream grades and side embankments on downstream slope of Camp Pond Dam towards Richland Creek. • Place quarry stones in Richland Creek.
Documents
No documents were attached to this posting. Get them from the agency through the official posting.
Similar open bids
No similar bids are open right now.