TTC - Palmer Campus Chiller Replacement *REVISED ATTACHED DOCUMENT**
Due in 4 daysNov 5, 2026
- Solicitation number
- H59-N401-JR
- Notice type
- Construction
- Posted
- Oct 14, 2026
- Set-aside
- None listed
- Location
- South Carolina
Summary
This work includes but is not limited to the replacement of the 125-ton air cooled chiller and dedicated chilled water pump.
Documents
No documents were attached to this posting. Get them from the agency through the official posting.
Similar open bids
No similar bids are open right now.