North Dale Drive Drainage System Improvements
Due in 88 daysJan 28, 2027
- Notice type
- Construction
- Posted
- Oct 16, 2026
- Set-aside
- None listed
- Location
- South Carolina
Summary
The project t includes the complete installation of 580 linear feet of 24” HDPE drain line. Included in this installation is 5 catch basins along with aprons to accept the stormwater runoff from the roadway section. The connection to the existing catch basin shall be at the southerly side of the entrance to the existing commercial use. As installation of the drain line progresses, it will be necessary to remove the existing line.