Cool Springs Pump Station Replacement
Due in 17 daysNov 18, 2026
- Notice type
- Construction
- Posted
- Oct 19, 2026
- Set-aside
- None listed
- Location
- South Carolina
Summary
Replacement of the existing 250 GPM Cool Springs Pump Station with a new duplex submersible pump station including all site work, new pumps, wet well, valve vault, generator, control panel, and above ground shelter, as well as installing approximately 41 linear feet (LF) of 8” gravity sewer and 25 linear feet (LF) 6” force main.
Documents
No documents were attached to this posting. Get them from the agency through the official posting.
Similar open bids
No similar bids are open right now.