Curltail Creek Sewer Rehabilitation
Due in 18 daysNov 19, 2026
- Notice type
- Construction
- Posted
- Oct 20, 2026
- Set-aside
- None listed
- Location
- South Carolina
Summary
Rehabilitation of approximately 8,315 feet of 8, 10, and 12 inch sewer via CIPP, an estimated 30+ service laterals, and 38 manholes. The sewers are to be lined with UV cured-in-place pipe (CIPP) lining. Work includes cleaning, televising existing sewers, installing CIPP lining in main sewers and laterals, rehabilitating manholes (frame/cover replacement, bench and invert re-builds, cementitious mortar coating, etc), making point repairs via excavation, by-pass pumping, and pavement restoration.
Documents
No documents were attached to this posting. Get them from the agency through the official posting.
Similar open bids
No similar bids are open right now.